Cooling Machine Usage
水(shui)管安裝(zhuāng)示意圖(tú) Installation schemes

用(yòng)途:用于(yu)給水槽(cao)的水進(jin)行降溫(wēn)。
特(te)點:根據(ju)水槽水(shuǐ)質含防(fang)粘劑化(huà)工産品(pin)腐蝕性(xìng)高的弊(bì)病,采用(yòng)純钛管(guǎn)蒸發器(qi),熱傳遞(dì)好耐腐(fu)蝕,改進(jin)了傳統(tǒng)的銅管(guǎn)蒸發器(qì)缺點。
公(gōng)共設備(bei)電力:電(dian)壓380V,50Hz。
①管道(dào)泵:2.2kw 兩台(tái)
②冷卻塔(ta):15噸
③塑料(liào)管1.5寸到(dào)噴水管(guǎn)爲4分管(guan)
④主電源(yuan)線:10平方(fāng) 四芯線(xian)
⑤水泵電(diàn)源線:2.5平(píng)方 三芯(xin)線
主(zhǔ)要技術(shu)參數 Technical Parameters | |
型号 Model | LJ-15HP |
機型Systems | 15HP |
外型(xíng)尺寸 Appearance Size: L*W*H(mm) | 1400*850*1450 |
功率Power (KW) | 11 |
重量Weight(kg) | 400 |
●上(shang)班:開機(jī)順序:提(tí)前十分(fen)鍾開機(jī)
1. 閉合冰(bīng)水循環(huan)泵
2. 閉合(he)熱水循(xun)環泵
3. 再(zài)閉壓縮(suo)機循環(huán)泵
●下班:随(sui)時斷電(dian)順序:
1. 斷(duan)開壓縮(suō)機
2. 斷開熱(rè)水循環(huan)泵
3. 斷開冰(bing)水泵
●移(yí)交時:1. 高(gāo)低壓的(de)正常值(zhi)是幾公(gōng)斤,高低(dī)壓控制(zhì)器的設(she)定值是(shi)幾公斤(jin),進行電(diàn)流是幾(ji)安,設定(ding)保護值(zhí)是幾安(an),均要記(ji)錄。
2. 機台(tái)維修前(qián)請參考(kao)以上的(de)正常值(zhi),維修前(qián)要清洗(xi)幹淨外(wài)觀和油(you)漬的位(wèi)置,便于(yú)電工機(jī)修工維(wéi)修人員(yuán)的操作(zuò)。
3. 空氣開(kai)關不可(kě)以随意(yi)換大的(de),以免燒(shāo)毀壓縮(suō)機。
維修(xiū)保養 Maintenance
保(bǎo)養定爲(wei)三個月(yue)清洗冷(leng)卻塔一(yī)次,十天(tiān)至十五(wu)天更換(huàn)水槽内(nèi)的水,(以(yǐ)免影響(xiǎng)材質)三(san)個月軸(zhou)承注油(yóu),免幹燥(zao)損壞,移(yi)位。
常見(jian)小問題(ti) Common small problem
●冰水循(xun)環:進料(liào)的噴水(shuǐ)管出水(shuǐ)量小
原因:1.水槽(cáo)吸水口(kou)粗過濾(lǜ)網賭了(le)碎膠料(liào)。
2.管道(dao)過濾器(qi)的不鏽(xiù)鋼濾網(wang)堵塞
清洗(xǐ)方法:務(wù)必停機(jī)水泵,取(qǔ)出濾網(wǎng)清洗幹(gàn)淨。裝好(hǎo)方可開(kāi)機。
●熱水(shui)循環:手(shou)摸冷卻(que)塔的水(shuǐ)溫感覺(jiào)比常溫(wēn)高。原因(yin):冷卻塔(ta)高溫狀(zhuang)态易産(chan)生污垢(gòu),循環水(shui)量不夠(gòu),散熱管(guǎn)道不通(tong)暢。
清洗(xǐ)方法: 1. 先(xian)将冷卻(què)塔底盤(pan)污垢打(da)掃幹淨(jìng)。
2. 重(zhong)新加水(shuǐ)添加适(shì)量除垢(gòu)劑,開循(xun)環泵運(yùn)行軟化(huà)6-8小(xiao)時。
3. 打開冷(lěng)凝端蓋(gài),用焊在(zai)鋼筋上(shàng)鐵刷子(zǐ)刷通管(guǎn)道。
4. 切記:需換(huan)清水三(sān)次,方可(kě)正常使(shǐ)用避免(miǎn)除垢劑(jì)腐蝕水(shuǐ)泵元件(jiàn)及制冷(lěng)管道。
●高(gao)壓跳: 1. 冷(leng)卻塔污(wū)垢積太(tài)多,冷卻(què)塔噴水(shui)轉盤堵(du)塞不轉(zhuǎn)等。
2. 水泵(beng)壞。冷卻(què)塔風機(jī)不轉。
3. 冷(lěng)凝管道(dào)污垢機(jī)過多。
4. 葉(yè)輪堵塞(sai),不自動(dong)補水等(děng)以上原(yuan)因引起(qǐ)流動不(bú)夠,水壓(yā)太小而(ér)跳。
5. 冷卻(que)塔配套(tao)不對,如(rú)十匹應(yīng)配十噸(dun)冷卻塔(ta)。
6. 制冷劑(jì)注入量(liàng)過多或(huo)更換部(bù)件時沒(méi)有經嚴(yán)格真空(kōng),系統含(han)有空氣(qi)。
●低壓跳(tiào):1. 冰水通(tong)道堵塞(sai)(參考冰(bing)水循環(huan)排除)引(yǐn)起蒸發(fā)钛炮結(jie)霜。
2. 制冷(leng)劑漏到(dào)靜止不(bú)足五公(gong)斤時。
3. 冷(leng)媒通道(dao)微堵不(bu)順口,如(ru)過濾器(qì)進出有(you)溫差,手(shou)閥進出(chu)有溫差(chà)。
4. 冰水泵(beng)配置不(bú)夠功率(lǜ)。
少見故(gù)障 Rare fault
壓縮(suo)機不工(gōng)作:1. 冰水(shuǐ)泵正常(cháng)運轉否(fou)。
2. 熱水器(qi)正常運(yùn)轉否。
3. 冰(bing)水熱水(shuǐ)泵均正(zheng)常方能(neng)啓動壓(yā)縮機。
4. 檢(jian)查空氣(qì)開關,接(jiē)觸器,繼(ji)電器,壓(ya)力開關(guan),溫控器(qi)等電路(lù)由專業(yè)電工檢(jian)修。
冷炮(pao) evaporator 熱炮 condenser風(fēng)機 fan 開水(shuǐ)閥 water valve手閥(fa) handvalve 水泵 water pump
細(xì)濾 fine filter 粗濾(lü) coarse filter開關 switch 噴(pēn)水管 spray pipe球(qiu)閥開關(guān) ball valve switch此不可(kě)裝開關(guan) Don’t fix switch here.
Purpose: Used to cool the water in the sink
Advantage: According to the water quality of the flume contains anti - adhesive chemical products corrosion high disease,Pure titanium tube evaporator,Good heat transfer corrosion resistance,The shortcomings of traditional copper tube evaporator are improved.
Cooling Machine:Installation instructions
Public equipment:Power: 380V,50Hz.
●①Pipe pump:2.2kw two sets.
②Cooling tower: 15tons
③Plastic pipe(1.5inches)to water pipe(0.4 inches)
④ Host power line: 10 mm²four-core
⑤ Water pump:2.5 mm² three-core
主要技(jì)術參數(shù) Technical Parameters | |
型号(hao) Model | LJ-15HP |
機型(xing)Systems | 15HP |
外(wai)型尺寸(cùn) Appearance Size: L*W*H(mm) | 1400*850*1450 |
功率(lü)Power (KW) | 11 |
重量(liàng)Weight(kg) | 400 |
●Start work: the steps of start-up: start up in ten minutes
1. Close the ice water circulation
2. Close the hot water circulation pump
3. Close compressor circulation pump
●After work: the steps of end power at any time:
1. Sconnect compressor
2. Disconnect hot water circulation pump
3. Disconnect the ice water pump
●Hand over:1.We should record the data as follow: the normal value of high-low pressure (kilograms),The setting value of high-low pressure controller (kilograms),The running current (amperes),The setting value of protection (amperes)
2. Please refer to the above normal values before the machine maintenance, clean cover and the position of oil in order to be convenient for repairman to operate.
3. Air switch can’t be change to a bigger one, in case of burning compressor.
Maintenance
Clean cooling tower at every three monthes, change the sink’s water at every ten days to fifteen days, (so as not to affect the material) infuse the oil into bearing at every three monthes, avoid dry damage, shift.
FAQ
●Ice water circulation: The water yield of the feed-in spray pipe is small.
Reasons: 1.The fragmentary rubber compoud is pluged up because
of the water sucking mouth of sink is thicker than dust gauze.
2. The stainless steel strainer of piping filter is pluged.
The cleaning method: Be sure to stop the pump, take out mesh to clean. Boot only after pack.
●Hot water circulation: The feeling temperature by touching cooling tower is higher than normal temperature.
Reason: The cooling tower is easy to produce dirt at high temperature, circulation water is not enough, heat pipe is obstructed.
The cleaning method:
1. First clean the cooling tower chassis’s dirt.
2. Add water and appropriate cleaner, open cycle pump running softening for 6-8 hours.
3. Open the cover of condensation, brush the pipeline by iron brush on steel bar.
4. Remember: change clear water three times to avid that cleaner corrode pump components and refrigeration pipeline corrosion.
●High pressure jump:
1. The cooling tower has too much dirt, the water spray of the cooling tower is jamed and not work.
2. Water pump doesn’t work. The fan of cooling tower doesn’t work.
3. Condensation pipes have too much dirt.
4.Impeller congestion, not to be automatic to fill water etc, these reasons cause the water flow is not enough, and water pressure is too small to lead to jump.
5. Cooling tower is in supporting the wrong horse, such as ten horse should match ten tons of cooling tower.
6. The injection quantity of refrigerants is too much or when replace parts without the strict vacuum, containing the air in the system.
●Low pressure jump
1. The cool water channel is jamed (reference ice water circulation to exclude) which cause evaporation titanium gun frost.
2. Refrigerants lead to the static is not to have five kilograms.
3. Cold channels micro plug, such as filters have different temperature in into and out of.
4. Ice water pump configuration doesn’t reach enough power.
Rare glitches
Compressor doesn’t work:
1. Whether the ice water pump works normally.
2. Whether the hot water pump operates normally.
3. he compressor can only be started after the ice water pump and hot water pump surely work normally.
4. Check air switch, contactor, relay, pressure switch, the thermostat and other circuits are checked and repaired by professional electricians.
技術(shù)支持:廈(sha)門易爾(ěr)通網絡(luo)科技有(you)限公司(si)泉州分(fèn)公司 信(xìn)息支持(chí):東南商(shāng)機網
京(jīng)ICP證000000号技術支(zhi)持:廈門(mén)易爾通(tōng)網絡科(kē)技有限(xiàn)公司泉(quán)州分公(gong)司 信息(xī)支持:東(dōng)南商機(jī)網
京ICP證(zheng)000000号·›
·
››·
•