用(yòng)途:用于橡膠出(chū)片冷卻把水吹(chuī)幹。
特點: 本機采(cǎi)用強力風機根(gēn)據風刀角度把(bǎ)膠片吹幹。
|
主要(yào)技術參數 Technical Parameters |
|
|
型号(hao) Model |
LJ-1200 |
|
外型尺寸Appearance Size: L*W*H(mm) |
1200*950*1430 |
|
工作(zuò)寬度Working Width(mm) |
600 |
|
風刀功率(lü)Power (KW) |
5.5 |
|
輸送功率Power (KW) |
0.75 |
|
重量(liàng)Weight(kg) |
300 |
使用說明
公共(gòng)設備電力:電壓(yā)380V,50Hz。
主電源線:4平 四(si)芯線
1、 機械運轉(zhuǎn)中手切勿接觸(chu)滾輪。
2、 橡膠片應(yīng)該保持平整進(jìn)料,防止卡料。
3、 進(jìn)料膠片厚薄要(yào)一緻且要平整(zheng)進入膠輥,太簿(bu)的膠片進膠棍(gùn)必需折成雙層(ceng),噴水量要夠多(duō),彈簧(進料膠棍(gun))不要調整過緊(jǐn),工人的操作速(su)度快,以免卷料(liào)。
4、 以上操作失誤(wù),如有卷料,清理(li)時,刀片一定不(bu)要損傷膠輥。
5、 後(hou)面出料膠輥進(jin)料時,簿料必需(xū)折成雙層稍微(wēi)一點拉力。不緻(zhi)于卷料,仍有存(cún)大阻料,查彈簧(huang)是否調整不當(dang),查膠輥是否卡(kǎ)住,上面膠輥和(he)下面膠輥是否(fǒu)緊貼,軸承是否(fǒu)沒換油卡死,鏈(lian)條是否過松等(děng)。6、 壓水不幹,煉膠(jiao)機上要裝齊邊(biān)刀,減少碎料,平(píng)整一緻,調整膠(jiāo)輥彈簧,注意彈(dan)簧不要調死,以(yǐ)免損壞電機。
7、 膠(jiāo)片如兩邊跑動(dong),請調整膠輥兩(liang)端彈簧壓力一(yi)緻。
8、 機台工作時(shi),手一定不要伸(shēn)進裏面,如有問(wen)題,一定要停機(ji)解決。
9、 滾輪工作(zuò)時旋轉不正常(cháng),請檢查鏈條松(song)緊情況,齒輪是(shi)否損壞。
10、 發現電(diàn)機有異聲,要停(ting)機檢查,鏈條皮(pi)帶松動要及時(shí)調整,螺絲松動(dòng)要及時緊固。
11、 如(ru)風刀出風量小(xiao),查看過濾網是(shì)否灰塵過多堵(dǔ)塞,清洗過濾網(wang)。
Rubber water cooling machine:
Purpose: Used for rubber sheet cooling to dry the water.
Specialty: The machine USES a strong fan to dry the film according to the Angle of the blade.
|
主要技術參數(shu) Technical Parameters |
|
|
型号 Model |
LJ-1200 |
|
外型尺寸(cùn)Appearance Size: L*W*H(mm) |
1200*950*1430 |
|
工作寬度Working Width(mm) |
600 |
|
風刀(dāo)功率Power (KW) |
5.5 |
|
輸送功率(lǜ)Power (KW) |
0.75 |
|
重量Weight(kg) |
300 |
INSTRUCTIONS:
Public equipment:Power: 380V,50Hz.
Host power line: 4mm² four-core
1. Do not touch the cutter die and roller during the operation of the machine.
2. Rubber sheet should be kept flat to prevent material from sticking.
3. The thickness of feeding rubber slices must be consistent and the rubber slices should enter in the same level. Too thin rubber slices should enter in a way of double-decker. Water them with enough volume; do not adjust the spring too tight. The operating speed must be fast enough to avoid material rolling.
4. If above operational errors occur and material rolled, don’t let the blade operate the rubber roller when cleaning up.
5. When the triple-rubber-roller is feeding material, thin one must be folded into double-decker. If there still exist non-smoothly feeding, check whether the spring is adjusted properly; or check whether the rubber roller is blocked;
check whether the upper rubber roller is stuck with the lower one; or check whether the bearing roller is blocked for without oil replacing ;or check whether the chain is too loose, etc .
6. Pressurized water quit ,the knives should be installed in a level to the rubber making machine . Reduce rubber oddments and make rubber in a level and in the same thickness. Do adjust the spring, but not too tight to avoid damaging the MORTOR.
7. Rubber out of the sheet partial movement, please adjust the cots at both ends of the spring pressure consistent.
8. Do stop the machine when there is problem. Do not put hands in when the machine is still working.
9. The roller does not rotate properly when working. Please check the tightness of the chain and whether the gear is damaged.
10. Any unusual voice, stop and check. Adjust chains and screws if they are loose.
11. If the air output of the air knife is small, check whether the filter is clogged with too much dust and clean the filter.
技術支持:廈門(mén)易爾通網絡科(ke)技有限公司泉(quan)州分公司 信息(xi)支持:東南商機(ji)網